top of page

EPQ ENTRY 22: Plan Update

  • Robyn Salt
  • Sep 4, 2015
  • 1 min read

WEEK 12, PHASE 3

It's been a week since I first began my third phase and I've produced a blueprint of my kitchen darkroom. I've planned where the wet side and dryside equipment goes so that I have a circular motion to avoid contamination which would reduce the quality of my prints. I've also gone as far to design the process through examining the manual books and cross referencing the information. If the process I have designed doesn't produce a successful print then I plan to try the variants of the development timings. I believe that having a backup is a good way of planning ahead as if problems occur I will be ready to solve this.

 
 
 

Kommentare


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page