top of page

EPQ ENTRY 25: Sketchbook Update

  • Robyn Salt
  • Sep 15, 2015
  • 1 min read

WEEK 14, PHASE 3

Before I can progress with my construction phase I'll have to restore my damaged sketchbook. After considering re-working the damage I have decided that the way that the ink has run is too extensive to cover. This means that I'll have to start my sketchbook from the beginning.

HOW I PLANNED AHEAD FOR PROBLEMS:

- After each phase I scheduled a 'buffer week' before the next phase in case of unexpected time clashes which I can now include into my project to catch up

STRENGTHS OF THIS CHOICE:

- My book will be presented to the high quality it once was

- It will be more challenging to completely overcome a problem and will prove the strength of my planning skills

WEAKNESSES OF THIS CHOICE:

- It is the most time consuming

- I cannot predict exactly how long restoring the book will take so it is risky and can affect whether I meet the final deadline

 
 
 

Comments


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page